DUMP TRAILER Energy UNIT-DOUBLE ACTING
Common Description
This energy unit features a power up energy down circuit with load holding on each A & B ports. A strain compensatred flow manage might be additional to circuit to regulate the decent speed with the cylinder.
Particular Notes
one. This electrical power unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
2. Clean every one of the hydraulic elements concerned prior to set up of the electrical power unit.
three. Viscosity on the hydraulic oil shoud be 15~46 cst, which ought to also be clean and totally free of impurities. N46 hydraulic oil is encouraged.
four. The power unit really should be mounted horizontally.
5. Check the oil degree within the tank soon after the first operating in the energy unit.
six. Oil shifting is required immediately after the original 100 operation hours, afterwards as soon as each and every 3000 hrs.

DUMP TRAILER Electrical power UNIT- SINGLE ACTING
General Description
This power unit features a power up gravity down circuit. Get started the motor to extend the cylinder and activate the solenoid valve to retract the circuit. Guide override to solenoid valve is usually supplied if necessary. Also a pressure compen sated movement management is often extra to your circuit to regulate the descent pace on the cylinder.
Remark: Please consult our product sales engineer for your unique pump displacement, motor electrical power or tank capability.
Specific Notes
1. This electrical power unit is of S3 duty cycle, i.e., non-continuous operation, 30 seconds on and 270 seconds off.
two. Clean the many hydraulic elements concerned before set up of the electrical power unit.
three. Viscosity of the hydraulic oil shoud be 15~46 cst,which really should also be clean and absolutely free of impurities.N46 hydraulic oil is advisable.
4. The electrical power unit ought to be mounted horizontally.
five. Check the oil degree inside the tank immediately after the preliminary operating of the electrical power unit.
six. Oil shifting is required just after the preliminary a hundred operation hours, afterwards when each 3000 hrs.